Batch volume

Volume of mortar you need to produce.

L
%

Binder system

Total binder content and cement replacement by mass.

kg/m³
Binder 1 (cement replacement)
%
Binder 2 (cement replacement)
%
Cement (remaining): 100.0% OK

Water & admixture

% of binder

Fine aggregate (sand) system

Sand volume is calculated by difference (absolute volume method), then split across natural sand and replacement materials.

%
Sand replacement 1
%
Sand replacement 2
%
Sand replacement 3
%
Natural sand (remaining): 100.0% OK

Batch report

Quantities required for the specified batch volume.

Batch volume
Total binder
w/b ratio
Air content
Material SG Volume (L) Mass (kg)